July 03, 2007 The Anti-Collapse Frame was Assembled.
The anti-collapse frame was assembled at the ground level.
The beams of 2nd floor and the girders of Line B and 1 were set up.

The anti-collapse frame was assembled at the ground level.
The beams of 2nd floor and the girders of Line B and 1 were set up.